Campbellfield Weighbridge Installation (2022) - Anmar Scales
 

Campbellfield Weighbridge Installation (2022)

Campbellfield Weighbridge Installation (2022)

INSTALLED:

2022

BRIDGE:

10m pitted / in-ground concrete deck weighbridge

LOCATION:

Campbellfield
VIC

Description :

  • Scrap metal facility weighbridge
  • New in-ground / pitted weighbridge
  • Built inside warehouse
  • Complete turnkey installation. From ground excavation to final calibration and commissioning.
  • Locally manufactured weighbridge deck

Electronics:

  • Rice Lake Load Cells
  • Dini Argeo 3590 indicator & thermal printer